Project: Custom rubbish and recycling chute installation
Sector: Student Accomodation
Location: Corner of Mayoral Drive and Wakefield Street, Auckland
Client: Building owned by Cedar Pacific and managed by Unilodge
Architects: Nigel McKenna
Lead Contractors: ICON Construction
Project complete: Early 2021
AUT UniLodge Te Āhuru is a mixed use development containing 697 self-catered student apartments across two towers. North & South Towers will house 12 levels of student accommodation each. The lower levels comprise of The AUT Podium with fitness centre, basketball court, retail and hospitality spaces and other student services. Located in Auckland CBD, on the corner of Mayoral Drive and Wakefield Street, positioned at the centre of the AUT City Campus.
MacDonald Industries were commissioned to install the rubbish and recycling chute at AUT UniLodge building. MacDonald Industries installed the Chute combined with the Wilkinson Bi-Sorter and JD MacDonald Rotobin Rubbish Compactor making it the first time these two products have been installed together in New Zealand. With such high density living the combination of these two units addressed the recycling program as well as an efficient and cost effective way to get rubbish to the collection area.
Wilkinson Bi-Sorter - waste and Recycling System
The Bi-Sorter system allows waste and recycling to be efficiently and hygienically separated and collected into different wheelie bins with only one chute in multi-story buildings. Rubbish chutes are the best way to consolidate waste and recyclables from around the building into a single location for easier collection in the building basement. The Bi-Sorter can be installed with an interlock system where the user must first select rubbish or recycling then other users on other floors are locked out while rubbish or recycling is deposited into the chute.
JD MacDonald Rotobin - Bin Carousel and Compactor
Rotobin is a cost effective, fully automated unit specifically designed for the collection & compaction of rubbish within high density multi-story buildings like Unilodge. Working on a rotation basis, as each bin fills, the compactor base automatically rotates positioning an empty bin under the chute when required. Rotobin Bin Carousel fits four 1100L MacDonald Industries Wheelie Bins and offers a compaction ratio of up to 2:1.
MacDonald Industries technical consultants worked very closely with ICON Construction on this custom chute build. Providing expert knowledge in the design, manufacture and installation as well as ongoing support and training in the operation to Unilodge staff. MacDonald Industries have installed many custom chutes in New Zealand over the last over 45years and are committed to providing the best solution for the needs of each building.
Products supplied for Unilodge Student Accomodation:
Wilkinson Bi-sort Recycling Chute
MacDonald Rotobin - Bin Carousel and Compactor
MacDonald Industries Wheelie Bins - MGB
If you would like to learn more about Chutes, or have any questions, contact us and one of our highly experienced chute consultants will able to educate you and guide you through the process.