Project: Tile Space Warehouse Facility - Mt. Wellington
Sector: Office space / Warehouse
Project complete: April 2024
Client: South park Corporation
Address: Bell Ave Mt Wellington
Architect: Richard Horner of TSE Architects
Building Contractor: Elio Construction
The project, commissioned by Southpark Corporation and entrusted to Elio Construction as the main contractor, entailed the construction of a state-of-the-art industrial facility to accommodate the long-term tenant, Tile Space.
The scope of work includes the erection of a 7,500m2 warehouse, 600m2 of office space, 1,519m2 of breezeway and 500m2 of yard, with meticulous attention to internal and external detail and finishes
BRIEF
- Emphasis placed on the high-quality interior fitout,
- Durability to support high traffic area with large staff numbers
- Aesthetically pleasing bathroom fittings and fixtures
SOLUTION
RAK Suites and Urinals:
The RAK-Resort bathroom suite and RAK Venice urinal were highlighted for their elegant design and practical features.
The Rimless technology in toilets ensures a comprehensive clean flush, making maintenance easier and more hygienic.
ASI Bathroom Hardware:
Paper towel dispensers, soap dispensers, and toilet roll holders in a 304 satin stainless finish offer a combination of aesthetics and robustness, suitable for high-traffic areas.
Accessible Area:
MacDonald Industries products provide practical functionality and modern styling, essential for creating accessible bathrooms that meet regulatory standards. These products, including grab bars, shower sets, raised toilets, and backrests provide crucial support and stability, significantly reducing the risk of falls and injuries. By promoting independence, they empower individuals to perform daily hygiene routines with greater ease and confidence.
Delabie Tapware:
The mechanical mixer is suitable for everyone including people with reduced mobility, ensuring accessibility and ease of use. The Deck-Mounted Mechanical Basin Mixer is the perfect blend of functionality, hygiene, and durability.
Designed to promote water efficiency, the mixer has a flow rate limited to 5 lpm at 3 bar.
“The partnership between Southpark Corporation, Elio Construction, MacDonald Industries, and TSE Architects has resulted in the successful execution of a high-caliber industrial development, setting a benchmark for excellence in construction and design. MacDonald Industries emerged as the preferred supplier for these requirements, owing to their reputation for excellence and longevity in product performance. Throughout the project, Elio Construction experienced seamless cooperation and exceptional service from MacDonald Industries, facilitating a smooth integration of their products into the building's design.”
Hayden James QS Elio Construction